Moduloa Manufacturing is built as five projects that together would take a product from its design to its customer's door: the price, the suppliers, the route, the floor and the record. All five would stand on one shared foundation: a data model, not yet written, and one worked example. Every task is listed here with a plain test for done, and several people can work on the same task, each with its own deliverable.
Stage 0 · nothing is built · two seats · twenty-three open tasks · no commitment accepted yet · reviewed 5 October 2026, next by 2 November 2026
CHARTER Factory OS data model v0.1 · EX-100 open dataset Three tasks · research: some
Moduloa as a whole: the expert calls, the pilot product, the funder's read and the story
Five projects on one foundation. Every further piece sits inside one of them, and what they produce together is trust without a history.The rule under all five
One operating system, no second copy
One home for every fact, and one logged way to change a rule.
In the design, every fact Moduloa runs on has one home: one identity per part and unit, one log of what happened, one published way to change a rule. A second copy beside the OS is where a record stops being complete, so the OS has to remove the reason for it: a change request would be logged and answered with a date, and the fix would reach every hub. Nothing is built yet. One system for everything is the wrong goal at the edges. Your ERP stays yours and would read the record through a published API, machines keep their own controllers, and a spreadsheet stays welcome at intake as an on-ramp, converted and echoed back for your sign-off.
Twelve further pieces of the work could each look like a project of its own. None is: each is something one of the five has to achieve, and where a piece leans on a second project, the table says so.
Qualification covers what may be supplied as well as who: end-of-life notices and qualified substitutes (Q-04).The cost of a last-time buy lands in CHEQUER, and a redesign it forces is a new JACQUARD revision.
A rule the route reads before it compares cost (B-01).The certification it reads is JACQUARD's, and adding a hub stays the customer's quality decision.
What a floor must show before it runs blueprints (J-01).It borrows PYX's method (evidence on top of ISO, checked again, lost and regained), and WAYBILL reads it before it compares cost.
One code per part, a tree of codes per unit (R-02).Suppliers mark their parts under PYX, and the floor mints a code for each closed sub-assembly under JACQUARD.
From complaint to fix, with response time on record (R-03).The fix itself is the next JACQUARD revision.
Trust without a history
A new manufacturer has no track record to point to. What the five projects would produce together is trust without one: a price you can check line by line, suppliers qualified against a published standard, routes logged with their reasons, the same blueprint and jigs at every hub, and a record you can open. None of it is history yet. It is how history would be recorded.
The public record
The habit that earns that trust is not a sixth project either. It is the public record, practised in all five and already running here: the predictions register, terms published before anyone signs them, and the scorecard with its own ledger. The predictions register · The terms · The hub scorecard
The thesis describes the system in five layers, and the five projects are the work that builds it. They do not line up one to one: Layer 04, the factory OS, is the shared foundation; portable blueprints, humanoids as the design target and certified hubs are JACQUARD's work, and WAYBILL reads the certification; capacity as infrastructure is priced in CHEQUER. PYX and TOUCHMARK have no layer of their own: the thesis files suppliers under intake and the unit record under the factory OS.
The task board
Every task
Twenty-five tasks across five projects, the foundation and Moduloa as a whole. Each row opens its full card: the test for done, the effort, who it suits and what to read first. Looking by role? Each open invitation lists the tasks that suit it.
Pick a task, or name your own, and send a commitment request: the task, what you will deliver, and a date no more than three months after it is accepted. Moduloa answers yes or no. Once accepted, the commitment shows on the task and on your seat card with its date, and your first one takes the next number on the register. Several people can work on the same task, each with its own deliverable. A missed date is marked lapsed and a task handed back early is marked released; both stay on the record, and the task opens again.
Questions about any task go to seat 001, the founder, through the same page.
Stage 0 company work
Moduloa as a whole
Some Stage 0 work belongs to no single project: being one of the expert calls, choosing the pilot product, reading the model as a funder, and telling the journey. These four tasks are work for Moduloa itself, not pieces of the system. The rest of that work, from the thesis revision to the investor thesis, stays on the Stage 0 plan as Moduloa's own.
W-01Open
Be one of the expert calls
Done when
One call of at least 30 minutes on a named section of the thesis, saying where it holds and where it breaks, with notes published only with your consent.
A short case for one product category to run first, with its volume, its production tier and what it would need from a hub, tested against at least one real product.
A written review of the economics page and the thesis's business model by someone who has funded hardware: what would have to be true for Stage 1 to be fundable, and which number on the site they would test first.
A script and storyboard for the nine stops on the manufacturing page, every claim traceable to the page it comes from, with humanoids shown as a design target.