Qualified supplier terms
Draft for commentWhat a supplier would give Moduloa and get back, on lead time, quality, price and cash. The idea underneath is simple: every payment Moduloa makes is covered by a payment a customer has already made, and Moduloa owns no stock. Published as draft v0.2 on 2026-10-13, before any supplier has qualified, so suppliers can correct it before anything is frozen. Nothing here is in force.
Built by PYX, one of five projects on the task board. The customer side of the same money is in the commercial terms.
Five rules the rest follows from
Who holds which parts
A design built mostly from pool parts needs a smaller deposit, which rewards designs that use the shared list and makes the pool deeper for the next customer. A part counts as excess only if it has no demand within 90 days and cannot move to another customer. Excess held six months is charged against the deposit as obsolete.
What a supplier gives, and what it gets
| Tier | Entry | The supplier gives | Paid within | The supplier gets |
|---|---|---|---|---|
| Registered | Profile, capabilities, code of conduct, financial check | Quoted lead time per part family; an open-book quote | Not yet ordered from | The pooled demand forecast, anonymised |
| Qualified | ISO 9001 (2015 or 2026 edition) or a Moduloa audit for small shops; first-article inspection; first 10 orders watched | On-time delivery per order line, in full, at the hub dock; containment in 24 hours and root cause in 10 working days | 30 days from acceptance | Pooled requests in its scope |
| Preferred | 12 months qualified, score above threshold | At least 95% on time and 99% of lines conforming over 12 months; a committed lead time and upside band | 15 days from acceptance | First allocation of pooled volume; lighter incoming inspection |
| Anchor | Preferred, and willing to reserve capacity | Reserved capacity with a frozen window written into the contract | 7 days from acceptance; long-lead material paid up front from the customer's deposit | A minimum volume, a multi-year term, first call on new programs |
| Watch | Below threshold two quarters running | A corrective plan | As the tier below | No new scope until recovered |
Acceptance is 10 working days after the hub receives the goods, then the payment clock starts. Large US buyers take 59 days to pay on average and large European buyers 72.6 (Hackett Group, 2025). The word "certified" stays with hubs: suppliers are qualified.
How a customer's payment reaches the supplier
The customer pays the capacity subscription a year ahead. Before any order goes out, it pays for everything that cannot be returned. Tooling is paid half at order and half at first-article approval. The balance is due when the batch is built and tested, before it ships. An illustrative order of 500 units, at EUR 195 a unit landed and a EUR 4,000 test fixture, with a Preferred supplier:
| Day | What happens | Customer pays | Paid out | Held for the order |
|---|---|---|---|---|
| 0 | Customer-specific parts paid (500 × 120) and half the fixture; orders placed | 62,000 | 2,000 | 60,000 |
| 35 | Customer-specific parts reach the hub; acceptance starts | 60,000 | ||
| 40 | Fixture approved; second half paid through | 2,000 | 2,000 | 60,000 |
| 50 | Batch built and tested; balance paid: pool parts, assembly, freight and duty | 37,500 | 97,500 | |
| 52 | Shipment leaves; freight and duty paid | 5,000 | 92,500 | |
| 64 | Customer-specific suppliers paid, 15 days after acceptance | 60,000 | 32,500 | |
| 65 | Pool supplier and hub paid | 32,500 | 0 |
The balance held for the order never goes below zero, so Moduloa finances nothing. The supplier of customer-specific parts is paid 29 days after delivery, from money that already exists.
What many customers together are worth to a supplier
What is not settled
No supplier has qualified, Moduloa AS is not yet registered, and no qualification standard is in force. Every figure on this page is a proposal. The structure is being checked with a lawyer and an accountant before any of it becomes a numbered commitment beside T-01 to T-08: who is the seller of record, where a customer's deposit sits, and how VAT falls on deposits and exports. The late-delivery remedy waits on a reading of NL 17. No public benchmark exists for upside flexibility bands, because every filed contract found redacts them, so that number is ours to set and yours to challenge.
If you run a machine shop, an electronics line or a distribution business, the useful corrections are the ones only you can make: whether these payment days would change your price, which change windows you could live with, and what would make the pool list worth stocking. Send a correction.
Related research
- The work went to the integrators. The money went to the factories. · 12 October 2026
- Someone has to own the hall · 12 October 2026
- The measurement layer arrived, and it points at the robot · 12 September 2026
Every note is in the Journal.